Capital Fort business tower
- Location
- Sofia, Bulgaria
- Period
- 2013 – 2014
- Client
- Capital Fort OOD
- Contractor
- HMC
Steel elements for the crown and structural nodes of Bulgaria’s tallest building (126 m).
Fabrication and erection of the complex steel structures for the building’s signature “crown” and inter-floor connections. The project demanded high precision in fabrication and erection at height.
Let's build together